The city of Atlanta is one step closer to creating a new reservoir that will hold a 40 day emergency water supply.
A massive drill called Driller Mike has completed a 5-mile tunnel from Bellwood Quarry in West Atlanta to the Hemphill water treatment plant.
Once completed the reservoir will hold 2.4 billion gallons of water.
Related: A Trip Inside The Massive Tunnel Being Dug By ‘Driller Mike’ >>
“The construction of the Westside reservoir is a commitment by the city of Atlanta that to ensure that our residents or businesses are not blindsided by a drought or some catastrophic event,” Mayor Keisha Lance-Bottoms said at a news conference Wednesday.